OVERVIEW
JK Fabrications were contracted by Grahams for the manufacture and delivery of a grade 316L stainless steel screening system, including 2 bespoke screening chambers and wall support brackets.
We also were contracted to manufacture, deliver and install access steelwork over the macerator chamber and access steelwork and two access ladders to the storm screen chamber including handrail modifications, this included the design, manufacture, and installation of a 24m2 and a 14m2 flow forge flooring to NI Water specifications.
Lastly, we removed the existed storm screen including the removal of the existing gantry rail and replacement with a new upsized gantry rail.
PEOPLE
- Project Manager: Chris Hickey





LOCATION
Sydenham Sewage Pumping Station
Airport Rd, Belfast BT3 9DY