OVERVIEW
JK Fabrication Limited worked on the Thames Water Crossness Sewerage Contract for the mechanical installation and refurbishment of a Victorian pumping station.
The upgrade included JK Fabrications installing 13 pumps within the facility and manufacturing and installing scothkoted pipework at a range of 900/700 for each pumping system.
PEOPLE
- Project Manager: Patrick King




LOCATION
Crossness IPS Waste Water Treatment Works
Bazalgette Way, Abbey Wood, London SE2 9AQ