Wakefield Anaerobic Digestion Plant

OVERVIEW

JK Fabrications joined the project in 2015, working with Imtech UK and RosRoca Envirotec, employed as a design and build sub-contractor for the mechanical elements of the project.

JK Fabrications Ltd was contracted in, to design, manufacture, install and test various diameter stainless steel pipework, ranging from Ø100mm to Ø400mm for the aerobic digestion plant. Also designed, manufactured, installed were 4 No. Pasteurisation Stainless Steel Vessels of size 6.5m x Ø3.5m.

PEOPLE
  • Contracts Manager: Christopher Hickey
  • Project Manager Patrick King
  • Site Manager: Graeme Gregg
LOCATION

Wakefield Anaerobic Digestion Plant

Brigantian Way, South Kirkby, Pontefract WF9 3TH