Norbrook Laboratories, Station Works

OVERVIEW

In 2017, Norbrook Laboratories came to JK Fabrications Ltd with the view in upgrading their Carnbane Works premises, following on from the upgrade to the other 2 factories.

The upgrade consisted of the supply, delivery, installation, and testing of 304stainless steel chilled and cooling water pipework, ranging in size from 50mm to 200mm in diameter. Also included, was the supply and installation of all required lagging and classing for the pipework.

JK Fabrications Ltd also supplied and installed a stainless steel, grade 304, 10,000 Litre Hot / Cold pressurised Vessel, along with all associated pipework. The Vessel was designed and manufactured to the Pressure Equipment Directive (PED) 2014 / 68 / EU Standard.

PEOPLE
  • Project Engineer: Graeme Gregg
LOCATION

Norbrook Laboratories

Station Works, Station Road, Newry, Co. Down, Northern Ireland, BT35 6JP