Irton Water Treatment Works (WTW)

OVERVIEW

Due to deterioration in raw water quality and increased risk of pesticides within the raw water supply, the Irton Quality Scheme was developed.

JK Fabrications were sub-contracted by Glan Agua to manufacture ten Granular Activated Carbon (GAC) pressure vessels as well as manufacturing and installing all the pipework to each of the GAC pressure vessels.

PEOPLE
  • Project Manager: Graeme Gregg
LOCATION

Irton Water Treatment Works

Main St, Irton, Scarborough, Yorkshire, YO12 4RJ