Didcot Waste Water Treatment Works (WwTW)

OVERVIEW

JK Fabrications Ltd was selected off the eight20 framework to carry out work on the upgrade of the Didcot Water Treatment Works.

JK Fabrications Ltd was contracted to design, manufacture and install a complete 8.43m Picket Fence Thickener, which included the GRP Tank (8960 Ømm) (including GRP roof), Stainless Steel Picket Fence, diffusing drums, weir plates, and access pipework. Also supplied was the galvanised fixed bridge and access walkways and stairs.

To complete the project, JK Fabrications Ltd also undertook the full testing and commissioning of the Picket Fence before it was handed to the client for introduction into the works.

 

PEOPLE
  • Project Manager: Patrick King
LOCATION

Didcot Waste Water Treatment Works (WwTW)

Southmead Park, Moorbrook, Didcot