Crossness IPS Waste Water Treatment Works (WwTW)

OVERVIEW

JK Fabrication Limited worked on the Thames Water Crossness Sewerage Contract for the mechanical installation and refurbishment of a Victorian pumping station.

The upgrade included JK Fabrications installing 13 pumps within the facility and manufacturing and installing scothkoted pipework at a range of 900/700 for each pumping system.

PEOPLE
  • Project Manager: Patrick King
LOCATION

Crossness IPS Waste Water Treatment Works

Bazalgette Way, Abbey Wood, London SE2 9AQ